Project Category: Steelwork

  • Proserpine MMC Housing Installation Project

    Proserpine MMC Housing Installation Project

    Fennec Services installed 10 new dwellings — 20 modules across three two-storey buildings — for Ausco Modular in Proserpine. The scope covered crane coordination and module landing, welding and bolting, and full internal and external complexing, together with the supply and installation of second-storey stairs, handrails, balustrades and landings, vertical screens, carports, boardwalks and CFC-clad stairwells. Works were delivered by a crew of up to eight, supported by in-house drafting and project management.

    Project highlights

    • 10 dwellings
    • 20 modules
    • 14 weeks on site
    • 8 crew at peak
  • Mansfield Carport Works

    Mansfield Carport Works

    Fennec Services delivered a new steel-framed carport for a residential property in Mansfield, from engineering design and 3D modelling through to Form 21 final certification. The scope covered footings and concreting, erection of the fabricated steel structure, LVLs, trusses and battens, roof tiling with sarking to match the existing dwelling, two full-height brick veneer piers with brick slip finishes, termite protection, and stormwater connection to the legal point of discharge. Works were delivered by a crew of up to five, supported by in-house drafting and project management.

    Project highlights

    • 4 weeks on site
    • 1,200 face bricks
    • 2 brick piers
    • 5 crew at peak
  • Renovation of Oxley Church

    Renovation of Oxley Church

    Fennec Services delivered the full internal and external renovation of a Catholic church at Oxley. The scope covered demolition of the front wall, existing loft and entry ramp, a new front facade with structural steel columns and feature archways, a new steel-framed choir loft, Tasmanian Oak confessionals, and full sanctuary refurbishment with 450 m² of new ceiling, along with feature brickwork, custom entry doors, ducted air-conditioning, rewiring, and a new ramp with travertine paving and landscaping. Works were delivered by a crew of up to six, supported by RPEQ-certified design and in-house project management.

    Project highlights

    • 450 m² new ceiling
    • 1,700+ feature bricks
    • 14 weeks on site
    • 6 crew at peak
  • Koongal MMC Housing Installation Project

    Koongal MMC Housing Installation Project

    Fennec Services installed 12 modular housing units across four buildings — 24 modules in total — for Ausco Modular in Koongal, Rockhampton. The scope covered crane coordination and module landing, welding and bolting, and full internal and external complexing, together with the supply and installation of six double-storey stair sets, eleven single-flight stairs, four carports, screens, underbattening and decking. Works were delivered by a crew of up to nine, supported by in-house drafting and project management.

    Project highlights

    • 12 modular housing units
    • 24 modules across four buildings
    • 14 weeks on site
    • 9 crew at peak